RAW STEEL SERIES
THE COWBOY
Where iron meets the horizon, and every weld holds a story of grit.
The Cowboy is our signature Bridge-in-a-Box™, stripped down to bare, mill-finish steel; no powder coat, no polish, just the same rock-solid engineering.
$4,950*
* for 8’x20′ kit without wood or freight cost

WHY GO RAW
Bare steel, no fuss.
Some ranch hands would rather finish the job their own way. Our raw steel option skips the factory powder coating, giving you a more affordable bridge that arrives ready for your choice of paint or protective coating. It is a practical way to lower the upfront cost while still getting the same rugged steel construction underneath.
- Same engineered, prefabricated components as our Signature Bridge-in-a-Box™
- Mill-finish raw steel, no powder coating
- 4 Ton Load Capacity
- Built to carry cars, SUVs, half-ton pickups, farm and ranch trucks, UTVs, and compact tractors
- Same clear drawings and documentation for a smooth install




8′ x 20′ (10″ Bump Rail)
The Cowboy Kit Only – Assembly Required
- Prefabricated Modular Bridge Kit
- 10″ Bump Rail
- 4 Ton Load Capacity
- Bridge weight 1,595 lbs
- Requires Assembly
- Requires Decking

10′ x 20′ (10″ Bump Rail)
The Cowboy Kit Only – Assembly Required
- Prefabricated Modular Bridge Kit
- 10″ Bump Rail
- 4 Ton Load Capacity
- Bridge weight 1,685 lbs
- Requires Assembly
- Requires Decking
Shipping the Cowboy
Freight Quoted Before You Buy
The Cowboy Bridge Kit ships by commercial freight due to its size and weight. Shipping costs vary based on your location, delivery access, and current freight rates, so freight is quoted separately before your order is finalized.
How Shipping Works
1. Request Your Freight Quote
Send us your delivery ZIP code and project details. We’ll calculate the freight cost and include it with your complete bridge quote.
2. Approve Your Order
Once you review and approve the bridge and freight pricing, we’ll confirm your order and provide an estimated production and shipping timeline.
3. Schedule Delivery
When your bridge is ready to ship, our team or the freight carrier will contact you to coordinate the delivery date. Someone must be available at the delivery location to receive and unload the shipment.
4. Unload Your Bridge Kit
The Cowboy arrives on a commercial freight truck. Customers are responsible for providing suitable equipment to unload it, such as a forklift, telehandler, skid steer with forks, or other properly rated equipment.
Before Delivery Day
Make sure the delivery location is accessible to a full-size freight truck and that your unloading equipment is onsite and ready. Limited-access locations, residential delivery, liftgate service, redelivery, or unusual site conditions may result in additional freight charges.
Need Help Planning Delivery?
Not sure whether a freight truck can reach your property or what equipment you’ll need to unload the bridge? Send us a few details about your site, and our team will help you prepare before the Cowboy hits the road.
What You’ll Need on Delivery Day
Before the truck arrives, make sure the following are ready:
- A clear delivery path for a full-size commercial freight truck
- Suitable unloading equipment, such as a forklift, telehandler, or skid steer with properly rated forks
- A trained equipment operator available at the scheduled delivery time
- An onsite contact who can meet the driver and inspect the shipment
- A level staging area where the bridge kit can be safely unloaded
- Enough space for the truck to enter, maneuver, and exit
The freight driver is not responsible for unloading the bridge. Additional charges may apply if the truck cannot access the site, unloading equipment is unavailable, or delivery must be rescheduled.
Route 66 Turns 100 - See How Roadrunner Is Part of the Legacy.