Skip to main content
Route 66 Turns 100 - See How Roadrunner Is Part of the Legacy. Watch the Video →

Our Signature
Bridge-in-a-Box™

Built for Real-World Property Access

Whether you’re crossing a creek, drainage ditch, or low-water crossing, this Bridge Kit gives you fast, reliable access to the other side of your land.

Customer spotlight: Buddy Pilgrim on our bridge kits.

Supports the Vehicles You Use Every Day

Our 8,000-lb bridge kit is engineered to safely support the most common vehicles used on rural, residential and working properties, including:

  • Cars and SUVS
  • Half-ton pickup trucks (F-150, Silverado 1500, Ram 1500, Tundra)
  • Farm and Ranch trucks
  • UTVs and side-by-sides
  • Compact tractors and skid steers

If it’s a vehicle you normally drive on your property, this bridge is built to handle it.

Designed to install with CONFIDENCE

Every Roadrunner bridge kit is engineered for a smooth, predictable installation—so crews can move efficiently from delivery to final placement.

    • Engineered, prefabricated components – arrive ready to assemble

    • Clear drawings and documentation – reduce guesswork on site

    • Efficient installation process – minimizes disruption

    • Proven systems – installed across golf courses, resorts, and public spaces

Step by Step Assembly

This video walks through the assembly process and outlines what’s included in our bridge kits.


Simple. Strong. Ready to Cross.

Stop driving around the creek. Start using your entire property now.

8′ x 20′


Installed modular bridge kit spanning a small creek on a golf course, featuring steel rails and wood decking integrated into the landscape.

8′ x 20′ (10″ Bump Rail)

Kit Only – Assembly Required
  • Prefabricated Modular Bridge Kit
  • 10″ Bump Rail
  • 4 Ton Load Capacity
  • Bridge weight 1,595 lbs
  • Requires Assembly
  • Requires Decking
Starting at $5,940
Pedestrian bridge with timber deck and steel railing for trail access.

8′ x 20′ (10″ Bump Rail)

Factory Assembled
  • Prefabricated Modular Bridge Kit
  • 10″ Bump Rail
  • 4 Ton Load Capacity
  • Bridge weight 3,595 lbs
  • Includes Assembly
  • Wood: Douglas Fir or Pine 
Starting at $12,350
Pedestrian bridge with timber deck and black rails, ideal for pathways.

8′ x 20′ (36″ Hand Rails)

Kit Only – Assembly Required
  • Prefabricated Modular Bridge Kit
  • 36″ Hand Rails
  • 4 Ton Load Capacity
  • Bridge weight 2170 lbs
  • Requires Assembly
  • Requires Decking
Starting at $7,260
Pedestrian bridge with timber deck and black rails, ideal for pathways.

8′ x 20′ (36″ Hand Rails)

Factory Assembled
  • Prefabricated Modular Bridge Kit
  • 36″ Hand Rails
  • 4 Ton Load Capacity
  • Bridge weight 4,170 lbs
  • Includes Assembly
  • Wood: Douglas Fir or Pine
Starting at $13,560

10′ x 20′


Pedestrian bridge with timber deck and black rails, ideal for pathways.

10′ x 20′ (10″ Bump Rail)

Kit Only – Assembly Required
  • Prefabricated Modular Bridge Kit
  • 10″ Bump Rail
  • 4 Ton Load Capacity
  • Bridge weight 1,685 lbs
  • Requires Assembly
  • Requires Decking
Starting at $6,820
Pedestrian bridge with timber deck and black rails, ideal for pathways.

10′ x 20′ (10″ Bump Rail)

Factory Assembled
  • Prefabricated Modular Bridge Kit
  • 10″ Bump Rail
  • 4 Ton Load Capacity
  • Bridge weight 4,185 lbs
  • Includes Assembly
  • Wood: Douglas Fir or Pine
Starting at $13,830
Pedestrian bridge with timber deck and black rails, ideal for pathways.

10′ x 20′ (36″ Hand Rail)

Kit Only – Assembly Required
  • Prefabricated Modular Bridge Kit
  • 10″ Tall Bump Rail 
  • 4 Ton Load Capacity
  • Bridge weight 2,260 lbs
  • Requires Assembly
  • Requires Decking
Starting at $8,140
Pedestrian bridge with timber deck and black rails, ideal for pathways.

10′ x 20′ (36″ Hand Rail)

Factory Assembled
  • Prefabricated Modular Bridge Kit
  • 10″ Bump Rail
  • 4 Ton Load Capacity
  • Bridge weight 4,760 lbs
  • Includes Assembly
  • Wood: Douglas Fir or Pine
Starting at $15,030

Shipping the Bridge in a Box

Freight Quoted Before You Buy

The Bridge Kit ships by commercial freight due to its size and weight. Shipping costs vary based on your location, delivery access, and current freight rates, so freight is quoted separately before your order is finalized.

How Shipping Works

1. Request Your Freight Quote
Send us your delivery ZIP code and project details. We’ll calculate the freight cost and include it with your complete bridge quote.

2. Approve Your Order
Once you review and approve the bridge and freight pricing, we’ll confirm your order and provide an estimated production and shipping timeline.

3. Schedule Delivery
When your bridge is ready to ship, our team or the freight carrier will contact you to coordinate the delivery date. Someone must be available at the delivery location to receive and unload the shipment.

4. Unload Your Bridge Kit
The Bridge Kit arrives on a commercial freight truck. Customers are responsible for providing suitable equipment to unload it, such as a forklift, telehandler, skid steer with forks, or other properly rated equipment.

Before Delivery Day

Make sure the delivery location is accessible to a full-size freight truck and that your unloading equipment is onsite and ready. Limited-access locations, residential delivery, liftgate service, redelivery, or unusual site conditions may result in additional freight charges.

Need Help Planning Delivery?

Not sure whether a freight truck can reach your property or what equipment you’ll need to unload the bridge? Send us a few details about your site, and our team will help you prepare before the Cowboy hits the road.

What You’ll Need on Delivery Day

Before the truck arrives, make sure the following are ready:

  • A clear delivery path for a full-size commercial freight truck
  • Suitable unloading equipment, such as a forklift, telehandler, or skid steer with properly rated forks
  • A trained equipment operator available at the scheduled delivery time
  • An onsite contact who can meet the driver and inspect the shipment
  • A level staging area where the bridge kit can be safely unloaded
  • Enough space for the truck to enter, maneuver, and exit

The freight driver is not responsible for unloading the bridge. Additional charges may apply if the truck cannot access the site, unloading equipment is unavailable, or delivery must be rescheduled.

Need A Little More Span And Strength

Or A Bridge With A Little Rise And Shine